Waverly Heights

Benchmark is partnering with Waverly Heights, a continuing-care retirement community, to build two independent living buildings, connected by underground parking, each building consisting of three stories with four apartments per floor. A new addition will be built onto an existing apartment building and will include underground parking. Enhancements to an existing connection between the community […]

Fellowship Community

Benchmark is partnering with Fellowship Community, continuing-care retirement community, to build three independent living buildings on its 67-acre campus. Phase 1 will break ground in Fall 2025. Each buildings will include 24 apartments ranging in size from 1,050 to 1,450 SF and featuring smart home technology. Apartment options include one-bedroom with a den and 1 […]

Penn Medicine Lancaster General Health

Benchmark, in partnership with Penn Medicine Lancaster General Health, completed a comprehensive renovation of an existing 9,728 SF medical infusion suite located at their Suburban Outpatient Pavilion. The project was strategically divided into two construction phases to ensure uninterrupted patient care, maintaining one fully operational infusion suite at all times. Key enhancements included expanding the […]

WellSpan Health

Benchmark partnered with LF Driscoll to construct an eight-story Surgical & Critical Care Tower and upgrade the existing Central Utility and Electrical buildings at WellSpan York Hospital. Before construction could start, our team demolished the existing six-story medical office building and a single-story building, both adjacent to the active hospital, helipad, and emergency department entrance. […]

Penn Medicine Lancaster General Health

This project transformed a long-vacant emergency department structure into a modern walk-in clinic dedicated to psychiatric and behavioral health care. The project encompassed comprehensive interior demolition and fit-out, resulting in specialized treatment zones, prep and recovery spaces, upgraded medical gas infrastructure, and new mechanical, electrical, and plumbing systems. With construction divided between two contracts to […]

Beacon Capital Partners

Building 9 at the Spring House Innovation Park was a 6-month interior fit-out to the first and third-floor shell spaces. The project aimed to create a spec laboratory for a future tenant. With the second floor occupied, working on both the first and third floors of the building poses a unique challenge for the construction […]

Johns Hopkins

The OR 15 project required Benchmark to deliver a highly technical healthcare renovation within one of the hospital’s most sensitive and operationally demanding environments. Initiated after water infiltration compromised critical surgical space, the project included the full renovation of OR 15 and the adjacent sterile equipment storage area while accommodating advanced Siemens medical equipment, structural […]

UGI, Inc.

Benchmark partnered with UGI, Inc. to construct a new operations center in Middletown, PA. The 11,480 SF pre-engineered metal building features a mezzanine, warehouse space with forklift ramp, offices, and a break room. The site includes CNG (Compressed Natural Gas) pump station, security fencing with gate, propane & pipe storage, and employee parking.

Elizabethtown College

The Anatomy and Physiology Classroom and Laboratory at Elizabethtown College, located within the Lyet Wing of the Masters Center, was carefully designed to support advanced learning and research. During preconstruction, the project team proactively managed potential delays by collaborating with the architect for an early release package, ensuring timely completion for the Fall semester. The […]

Penn Medicine Lancaster General Health

This project involved the relocation and expansion of the existing laboratory within Women & Babies Hospital by moving operations from the basement into a newly developed second-floor shell space. The scope included a new laboratory with an automated Beckman Coulter system, relocation of Sysmex and related laboratory equipment, a new and relocated pneumatic tube system, […]