Penn Medicine Lancaster General Health
This six-story overbuild, and expansion was built above an active radiology department, administrative suite, and vacant short stay unit. The expansion project includes a new helipad on the roof of the structure. This project presented many challenges to overcome including intense mechanical and electrical coordination to support select demolition. The utility interruption forecast, and detailed […]
Berks Community Health Center
Benchmark provided demolition and interior fit out of a 35,712 SF abandoned grocery store to house the Berks Community Health Center and various other community agencies. The space is located in a busy shopping plaza and is surrounded by other active retail stores. This particular space stood empty for five years prior to this renovation. […]
Penn State Milton S. Hershey Medical Center
Benchmark created a new operating room for the Children’s Hospital surgical suite. The scope of the project included rearranging and repurposing existing square footage to create the new OR #7, scrub alcove, and sub sterile room. The work reduced the size of the bio-med room and clean workroom and relocated the equipment alcove, and storage. […]
Penn Medicine Lancaster General Health
Benchmark provided the fit-out of a new state-of-the-art pediatric unit for Penn Medicine Lancaster General Health on the fourth floor of its recently completed patient tower, also constructed by Benchmark. The unit includes 17 patient rooms, two care team works areas, greeter area, pantry, lounge, a play area, and staff administration space. All rooms are […]
Children’s Hospital of Philadelphia
For this project Benchmark created a home healthcare support facility for the Children’s Hospital of Philadelphia (CHOP) from an existing 35,000 SF shell space. The facility houses everything needed to support discharged CHOP patients as part of their continued recovery. Amenities include specialty and compounding pharmacies, bio-med testing and processing, administrative spaces, and a warehouse. […]
PennState Health St. Joseph Medical Center
This project consisted of the demolition of two active catheterization labs and the construction of one, 900 SF hybrid catheterization lab operating room. The renovation also included a new clean utility room, equipment room, and a control room. The renovation took place in the hospital’s busy catheterization lab suite located adjacent to a PACU and […]
PennState Health St. Joseph Medical Center
Benchmark constructed the room to house a new LINAC which is an addition to an existing medical office building and is attached to the ground floor cancer center. Benchmark coordinated with the hospital’s vault construction vendor and essentially built the building around the vault. Construction included a four-foot thick mat slab under the entire addition […]
PennState Health Holy Spirit Medical Center
Benchmark worked with the Holy Spirit team to complete the conversion of six outdated ORs into three new operating suites. In addition to all new floors, walls, and casework, the rooms include disinfection lighting and green lighting. The disinfection lighting sterilizes the room when it is empty. The green lighting helps the medical staff better […]
Penn Medicine Lancaster General Health
Benchmark renovated the vault to replace an aging Varian C-Series linear accelerator at the Ann B. Barshinger Cancer Institute. The footprint of the treatment vault was limited due to the existing interior dimensions of the concrete vault walls. Careful consideration and planning ensured the new equipment, controllers and treatment cabinets would fit with the required […]
Caron Treatment Center
Constructed on a site located on the side of a steep incline, the new medical center acts as the “front door” to treatment in the heart of Caron’s active campus. This project incorporated extensive use of VDC for the layout, detailing and dimensioning of the building. Because of the grade of the site the building’s […]