Penn Medicine Lancaster General Health
The hospital underwent a much-needed expansion and renovation project in response to increased patient demands caused by the closure of a local hospital and the global COVID-19 pandemic. Our team partnered with LF Driscoll for this multi-phased project, which included the addition of a temporary emergency entrance and dining facilities, office renovations, reconfiguration of the […]
Sheppard Pratt
Benchmark is providing Construction Manager Advisor (CMA) services to the Sheppard Pratt for their new 85-bed behavioral health in-patient facility in Elkridge, MD. Facility amenities include administrative offices, food service, laundry, loading, therapy mall, and healing gardens. The building was built to LEED Silver standards. As the CMA on the project, Benchmark’s responsibilities include: Manage […]
Penn State Health Milton S. Hershey Medical Center
Benchmark partnered with Penn State Milton S. Hershey Medical Center on a multi-phased project to completely renovate their existing Endoscopy suite. Due to the nature of the project and keeping the suite operational during construction, our team worked at night to eliminate any noise disruptions to their daily operations. The scope of the project touched […]
UPMC
Part of the University of Pittsburgh Medical Center (UPMC), the UPMC Heart and Vascular Institute is one of the world’s premier centers for comprehensive cardiovascular care. Benchmark was contracted to construct a new home for the Institute to house various specialty areas — adult diagnostic cardiology, pediatric diagnostic cardiology, physical therapy, a research and staff […]
UPMC Harrisburg
This project consisted of a two-phased renovation of multiple spaces on the second floor of UPMC Harrisburg Hospital. The main purpose of this project was to create a new Neuro Bi-Plane procedure room within the interventional clinical suite. To achieve this, the existing locker room, clean supply, and equipment room spaces were adjusted to accommodate […]
Penn State Health Milton S. Hershey Medical Center
Benchmark partnered with Penn State Health to construct a 1,033 SF interfaith chapel in the hospital center courtyard Daily communication with key executives and lobby staff to provide constant reassurance that we are giving them full functionality of the surrounding area throughout the project. A new chapel on top of an existing roof. High-priority communication […]
Sheppard Pratt
The interior renovation of this patient care unit allowed for the expansion of Sheppard Pratt’s Retreat program to provide intensive therapeutic treatment to additional residents. With the building’s original construction dating back to the 1860s, this fit-out helped bring a luxurious home-like feel to the space while still maintaining some of the original finishes within […]
Penn Medicine Lancaster General Health
The Lancaster General Health Tri-Generation Plant is a 15,765 SF steel structure addition built directly over the hospital’s existing operational boiler house on East Frederick Street. This addition houses a new gas fired 4.5 Megawatt turbine that provides essential power to the hospital. The heat energy produced by the turbine unit is recycled to drive […]
Penn Medicine Lancaster General Health
This six-story overbuild, and expansion was built above an active radiology department, administrative suite, and vacant short stay unit. The expansion project includes a new helipad on the roof of the structure. This project presented many challenges to overcome including intense mechanical and electrical coordination to support select demolition. The utility interruption forecast, and detailed […]
Berks Community Health Center
Benchmark provided demolition and interior fit out of a 35,712 SF abandoned grocery store to house the Berks Community Health Center and various other community agencies. The space is located in a busy shopping plaza and is surrounded by other active retail stores. This particular space stood empty for five years prior to this renovation. […]