Charles F. Snyder
Charles F. Snyder Funeral Home & Crematory constructed a new, single-story, 12,770 SF facility on 3 acres to expand its offerings to those south of the City of Lancaster. The funeral home features a variety of amenities including: Oversized porte-cohére Modern lobby and reception area Large chapel and small private chapel Outdoor gathering terrace Arrangement […]
Sheppard Pratt
The interior renovation of this patient care unit allowed for the expansion of Sheppard Pratt’s Retreat program to provide intensive therapeutic treatment to additional residents. With the building’s original construction dating back to the 1860s, this fit-out helped bring a luxurious home-like feel to the space while still maintaining some of the original finishes within […]
Penn Medicine Lancaster General Health
The Lancaster General Health Tri-Generation Plant is a 15,765 SF steel structure addition built directly over the hospital’s existing operational boiler house on East Frederick Street. This addition houses a new gas fired 4.5 Megawatt turbine that provides essential power to the hospital. The heat energy produced by the turbine unit is recycled to drive […]
Penn Medicine Lancaster General Health
This six-story overbuild, and expansion was built above an active radiology department, administrative suite, and vacant short stay unit. The expansion project includes a new helipad on the roof of the structure. This project presented many challenges to overcome including intense mechanical and electrical coordination to support select demolition. The utility interruption forecast, and detailed […]
Berks Community Health Center
Benchmark provided demolition and interior fit out of a 35,712 SF abandoned grocery store to house the Berks Community Health Center and various other community agencies. The space is located in a busy shopping plaza and is surrounded by other active retail stores. This particular space stood empty for five years prior to this renovation. […]
Penn State Milton S. Hershey Medical Center
Benchmark created a new operating room for the Children’s Hospital surgical suite. The scope of the project included rearranging and repurposing existing square footage to create the new OR #7, scrub alcove, and sub sterile room. The work reduced the size of the bio-med room and clean workroom and relocated the equipment alcove, and storage. […]
PennState Health St. Joseph Medical Center
This project consisted of the demolition of two active catheterization labs and the construction of one, 900 SF hybrid catheterization lab operating room. The renovation also included a new clean utility room, equipment room, and a control room. The renovation took place in the hospital’s busy catheterization lab suite located adjacent to a PACU and […]
PennState Health St. Joseph Medical Center
Benchmark constructed the room to house a new LINAC which is an addition to an existing medical office building and is attached to the ground floor cancer center. Benchmark coordinated with the hospital’s vault construction vendor and essentially built the building around the vault. Construction included a four-foot thick mat slab under the entire addition […]
PennState Health Holy Spirit Medical Center
Benchmark worked with the Holy Spirit team to complete the conversion of six outdated ORs into three new operating suites. In addition to all new floors, walls, and casework, the rooms include disinfection lighting and green lighting. The disinfection lighting sterilizes the room when it is empty. The green lighting helps the medical staff better […]
Dickinson College
Benchmark worked with Dickinson College and Deborah Berke Partners on the construction of the new High Street Residence Hall. The four-story, 40,475 SF building houses 129 students in both single- and double-occupancy rooms and is the newest addition to Dickinson College’s on-campus housing. In accordance with the College’s strong culture of sustainability, the new High […]