Pennswood Village Hybrid Apartments

Benchmark partnered with Pennswood Village to expand their independent living options with the addition of two hybrid apartment buildings. Each building is a 3-story structure using metal stud and plank construction and includes an elevator. Before work could begin, our team removed the existing parking lot, installed a retaining wall behind the West building, installation […]

Heritage of Green Hills

Heritage of Green Hills partnered with Benchmark and Meyer Design to design and construct a three-story memory support and personal care building on their campus. The new health care building includes a total of 70-suite: 20 memory care beds and 50 personal care beds. In addition to the individual units, the new building includes a […]

Caron Treatment Center

This project involved the renovation of an old 12,000-square-foot building, which had previously served as an administrative office building and marketing department. The conversion of this building into a research center made Caron the first recovery treatment center in the U.S. to have a research facility. The renovation required an almost complete teardown of the […]

Berger Communities

Benchmark partnered with Berger Communities to construct a 12-story mixed-use residential building on a tight urban site in downtown Lancaster, PA. The building features a variety of amenities including: 142 units Studio, one- and two-bedroom apartments Rooftop deck Fitness Center Community lounge Co-working and coffee lounges Dog washing station Bike storage The building is scheduled […]

Lancaster Public Library

Benchmark was contracted to oversee the construction of a new 43,000 SF space for the Lancaster Public Library, which was looking to move to a more convenient and centralized location. It offers expanded programming, specialized autism learning centers, modern study rooms, and meeting spaces for businesses and government departments. The accessible, state-of-the-art facility significantly enhances […]

UPMC Hanover

The new AHU replaces four existing units that serve the UPMC Hanover Hospital’s Emergency Department, MRI suite, and HR offices. In four separate sections, the custom unit was set on the new canopy our team constructed, with the heaviest section being 16,000 lbs. alone. It’s a 30,000 CFM unit measuring approximately 26’W x 41’L x […]

Charles F. Snyder

Charles F. Snyder Funeral Home & Crematory constructed a new, single-story, 12,770 SF facility on 3 acres to expand its offerings to those south of the City of Lancaster. The funeral home features a variety of amenities including: Oversized porte-cohére Modern lobby and reception area Large chapel and small private chapel Outdoor gathering terrace Arrangement […]

Penn Medicine Lancaster General Health

The Lancaster General Health Tri-Generation Plant is a 15,765 SF steel structure addition built directly over the hospital’s existing operational boiler house on East Frederick Street. This addition houses a new gas fired 4.5 Megawatt turbine that provides essential power to the hospital. The heat energy produced by the turbine unit is recycled to drive […]

Penn Medicine Lancaster General Health

This six-story overbuild, and expansion was built above an active radiology department, administrative suite, and vacant short stay unit. The expansion project includes a new helipad on the roof of the structure. This project presented many challenges to overcome including intense mechanical and electrical coordination to support select demolition. The utility interruption forecast, and detailed […]

Penn Medicine Lancaster General Health

Benchmark provided the fit-out of a new state-of-the-art pediatric unit for Penn Medicine Lancaster General Health on the fourth floor of its recently completed patient tower, also constructed by Benchmark. The unit includes 17 patient rooms, two care team works areas, greeter area, pantry, lounge, a play area, and staff administration space. All rooms are […]