Lancaster Cancer Center
The project consisted of the renovation of an existing orthopedic doctor’s office and establishing a cancer center complete with a pharmacy designed to meet USP-797 standards and a 16 chair infusion room. The owner came to us with a tight budget and specific requirements for treatment. The design team along with Benchmark’s construction team were […]
Living Branches
Benchmark was engaged by Living Branches to provide interior renovations to their Dock Woods community. The project was a multi-phased and focused on renovating approximately 79,000 SF of the facility’s common areas including the community center/bistro, outdoor patio, restaurant, chapel, corridors, lobby, and administrative offices. This campus supports independent living, personal care and affordable housing […]
Presbyterian Senior Living
Westminster Place at Ware is a wood-framed apartment building that consists of a combination of market-rate and low-income units. The owner received PA Housing Finance Agency (PHFA) financing for the project. There are 61 apartments – 31 available for low-income residents and 30 at market rate. All apartments have the same amenities. Options include 683 […]
Penn Medicine Lancaster General Health
The hospital underwent a much-needed expansion and renovation project in response to increased patient demands caused by the closure of a local hospital and the global COVID-19 pandemic. Our team partnered with LF Driscoll for this multi-phased project, which included the addition of a temporary emergency entrance and dining facilities, office renovations, reconfiguration of the […]
Penn State Health Milton S. Hershey Medical Center
This project entails a multi-phased renovation of the occupied ground floor of Hershey Medical Center’s Cancer Institute. Included in this project are a new check-in / check-out area, linear accelerator vault, MR LINAC vault, patient holding bays, exam rooms, and updated corridor finishes. We work daily with not only key executives but with the nurses […]
UPMC West Shore
The project consists of a three-story overbuild and a five-story addition on the east side of the existing West Shore Hospital. The overbuild portion of the project is above the existing PACU, OR suite, and Emergency Department and ties back into the third-floor ICU and patient rooms on the upper two floors. The five-story addition […]
Penn State Health Milton S. Hershey Medical Center
Benchmark partnered with Penn State Milton S. Hershey Medical Center on a multi-phased project to completely renovate their existing Endoscopy suite. Due to the nature of the project and keeping the suite operational during construction, our team worked at night to eliminate any noise disruptions to their daily operations. The scope of the project touched […]
UPMC Hanover
The new AHU replaces four existing units that serve the UPMC Hanover Hospital’s Emergency Department, MRI suite, and HR offices. In four separate sections, the custom unit was set on the new canopy our team constructed, with the heaviest section being 16,000 lbs. alone. It’s a 30,000 CFM unit measuring approximately 26’W x 41’L x […]
UPMC
Part of the University of Pittsburgh Medical Center (UPMC), the UPMC Heart and Vascular Institute is one of the world’s premier centers for comprehensive cardiovascular care. Benchmark was contracted to construct a new home for the Institute to house various specialty areas — adult diagnostic cardiology, pediatric diagnostic cardiology, physical therapy, a research and staff […]
UPMC Harrisburg
This project consisted of a two-phased renovation of multiple spaces on the second floor of UPMC Harrisburg Hospital. The main purpose of this project was to create a new Neuro Bi-Plane procedure room within the interventional clinical suite. To achieve this, the existing locker room, clean supply, and equipment room spaces were adjusted to accommodate […]