Kendal at Longwood Health Center and Independent Living Apartments

Benchmark is proud to partner with Kendal-Crosslands Communities to expand their healthcare and independent living options, along with renovating amenities space on the Kendal-Longwood Campus.

Leading the Charge

Your On-site Project Team

Don Weeks, Senior Project Manager (center); Wyatt McMartin, Project Manager (far left); Chad Livingston, Superintendent (second from right)

Site Logistics Plan

Phase 1 – Duration

Project Information

We are thrilled to announce an exciting expansion for Kendal at Longwood, spanning an impressive total of 172,976 square feet! This project includes a fresh addition of 88,064 square feet of new construction alongside an extensive 84,912 square feet of modern renovations. The project includes 20 Independent Living (IL) Units, and 113 Healthcare units, designed with comfort and safety in mind. Not only will residents enjoy a brand-new courtyard perfect for relaxation and socializing, but they will also benefit from enhanced outdoor amenities including additional sidewalks and scenic walking paths.

The upgrades extend to our landscape, introducing sophisticated hardscaping and lush greenery that transform everyday views into picturesque scenes. Added resident storage spaces and a large gathering room provide convenient solutions and areas for community activities. Moreover, our culinary services are set to reach new heights with a newly updated commercial kitchen.

Project Team:

  • Lenhardt Rodgers Architecture + Interiors
  • Perkins Eastman
  • DCI Engineering
  • RGS Associates
  • Moore Engineering
  • Steven Winters Associates
  • Food Facilities Concepts, Inc.

Project Highlights

Groundbreaking Ceremony February 2024

Join us in celebrating the kickoff of this amazing project!

Benchmark Takes Flight!

We’re excited to share a sneak peek into the transformation happening at Kendal at Longwood. Our teams are hard at work, making way for a new health campus addition. From removing asphalt and excavating soil to the preparation of the tie-in to the existing structures, every step brings us closer to enhancing our community’s care capabilities.

Site Preparation is Underway!

Join us as Superintendent Chad Livingston gives us a brief update about what’s happening in and around the Kendal at Longwood Campus. Catch a glimpse of the water and sewer connections being finalized, as well as a view of the future staff and resident parking area.

Watch us LIVE!

Keep up on the action around the job site by viewing this live update of the building progress (refreshes every 10 mins).