UPMC Community Osteopathic

With the hospital consistently near capacity, Benchmark was called upon to handle the work of fitting out the 5th floor shell space. Two months into the project, the owner requested that the project schedule be reduced from nine months to seven. After conducting a planning workshop, Benchmark was able to align with the new end […]

WellSpan Ephrata Community Hospital

This project included the expansion of the existing laboratory to create a new cardiovascular laboratory. The “cath lab” was constructed on top of the active emergency department at WellSpan Ephrata Community Hospital’s main facility and offers diagnostic cardiac catheterization as well as diagnostic and interventional vascular procedures. The laboratory includes eight pre-op and recovery rooms, […]

United Church of Christ Homes

This project involved the interior renovation of all three wings of the existing skilled nursing facility as well as the common spaces in the residential living portion of the facility. In addition, there was a small addition to the dining room and complete roof replacement. In the skilled nursing area, the renovations were to update […]

St. Anne’s Retirement Community

Benchmark recently completed two, three-story, wood-framed independent living apartment buildings connected by a community center, several duplex cottages on the south end, and a three-story wood-framed independent living building of the St. Anne’s campus. The scope of work included all necessary underground utilities, all associated site work, lawn and landscaping, site lighting, and sidewalks. The […]

Donegal Mutual Insurance

The Donegal Mutual Insurance Boiler House replacement included demolition of the existing maintenance building.  In its place features a 3,774 SF maintenance and boiler plant building. The new boilers within the plant replaced the existing boilers located in the main building.  The new natural gas boilers have a fuel oil back-up system allowing for future […]

Pennsylvania College of Art and Design

The “Face Forward” project transformed the plain, five-story, square building’s concrete and EIFS façade into a piece of art to mirror the creativity within the college. The lobby and art gallery finishes were also updated. The interior renovations involved relocating the library and administrative offices, adding four classrooms, a board room, and a large atrium. […]